By philip stevens I designboom
costing approximately €34 million, the work involves both the renovation of the existing structure, alongside the addition of 35,000 square meters of new floor space.
The post CEU campus development by o’donnell + tuomey breaks ground in budapest appeared first on designboom | architecture & design magazine.

